Burnham 8H Series Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Chauffe-eau et chaudières Burnham 8H Series. Burnham 8H Series Operating instructions [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 92
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
1
81416021R3-6/10
DNAGNITAREPO,NOITALLATSNI
ROFSNOITCURTSNIECIVRES
SEIRES 8H
RELIOBDERIF-SAG
,reliobnonoitamrofnignikeesnehW.rotcartnocgnitaehruoyllac,reliobotsriaperroecivresroF
.lebaLgnitaRnonwohssarebmuNlaireSdnarebmuNledoMrelioBedivorp
rebmuNledoMrelioB rebmuNlaireSrelioB etaDnoitallatsnI
____-_____8_ _______6
rotcartnoCgnitaeH rebmuNenohP
sserddA
Price - $5.00
Commercial Boilers
www.burnhamcommercialcastiron.com
3050579
Vue de la page 0
1 2 3 4 5 6 ... 91 92

Résumé du contenu

Page 1 - SEIRES 8H

181416021R3-6/10DNAGNITAREPO,NOITALLATSNIROFSNOITCURTSNIECIVRESSEIRES 8HRELIOBDERIF-SAG,reliobnonoitamrofnignikeesnehW.rotcartnocgnitaehruoyllac,relio

Page 2

10F. Move boiler to permanent location by sliding or walking. Do not drop. For Packaged Boiler, proceed to Paragraph L.G. Conrm that one (1

Page 3

11Figure 6: Flame Roll-out Switch InstallationFigure 7: Burner/Burner Access Panel Installation

Page 4

12M. Attach Flame Roll-out Switch to Burner Access Panel. See Figure 6. Flame Roll-out Switch and hardware are located in Combination Boiler Parts a

Page 5 - Table 1: Dimensional Data

13Figure 8: Jacket Assembly

Page 6 - I. Pre-Installation

14Figure 9: EP/OP Control Installation

Page 7

15III. Gas Control System Assembly (Knockdown Boilers)A. 24V Standing Pilot Control System Install Gas Control System. All components are located

Page 8 - II. Boiler Assembly

16F. EP-CSD-1 Control System Install Gas Control System. All components are located in Combination Boiler Parts and Control Carton.1. Install Gas

Page 9

17Figure 10: Schematic Gas Piping, 24V Standing Pilot, 806H & 807H

Page 10

18Figure 11: Main Gas Piping, Intermittent Ignition (EI)

Page 11

19Figure 12: Schematic Pilot Piping (Honeywell EI), USA

Page 12

2IMPORTANT INFORMATION - READ CAREFULLY NOTE: The equipment must be installed in accordance with those installation regulations enforced in the a

Page 13 - Figure 8: Jacket Assembly

20Figure 13: Schematic Pilot Piping (Honeywell EI)Canada: Natural Gas, 805H - 810H; LP Gas, 806H - 807H

Page 14

21Figure 14: Schematic Gas Piping, OP Control System, 806H - 810H

Page 15

22Figure 15: Schematic Gas Piping, OP-CSD-1 Control System, 808H - 810H

Page 16 - F. EP-CSD-1 Control System

23Figure 16: Schematic Gas Piping, EP Control System (Natural Gas Only), 806H - 810H

Page 17

24Figure 17: Schematic Gas Piping, EP-CSD-1 Control System, 808H - 810H

Page 18

25IV. Water Trim and PipingA. Design and install boiler and system piping to prevent oxygen contamination of boiler water and frequent water addition

Page 19

26D. Install Drain Valve in rear of Left End Section, Tapping “G”. See Figure 19. Components are located in Water Trim Carton.E. Install Temperatu

Page 20

272. If boiler is connected to heating coils located in air handling units where they may be exposed to refrigerated air, boiler piping must be equi

Page 21

28a. A boiler by-pass is recommended for any installation for improved system temperature balance, while serving to protect the boiler from sustained

Page 22

29V. Gas PipingWARNINGFailure to properly pipe gas supply to boiler may result in improper operation and damage to the boiler or structure. Al

Page 23

3WARNINGThis boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual.Improper installatio

Page 24

30Length(Feet)0.3 Inch w.c. Pressure Drop 0.5 Inch w.c. Pressure Drop½ ¾ 1 1¼ ½ ¾ 1 1¼10 132 278 520 1,050 175 360 680 1,40020 92 190 350 730 120 250

Page 25 - IV. Water Trim and Piping

31A. Install vent system in accordance with local building codes; or local authority having jurisdiction; or National Fuel Gas Code, ANSI Z223.1/NFPA

Page 26

32E. Boiler Equipped With Vent Damper. See Figure 26.1. Open Vent Damper Carton and remove Installation Instructions. Read Installation Instruction

Page 27

33Figure 27: Typical Vent System9. Design vent system for sea level input.10. Provide adequate ventilation of Boiler Room. See Section I: Pre-Insta

Page 28

34VII. ElectricalWARNINGFailure to properly wire electrical connections to the boiler may result in serious physical harm.Electrical power may be from

Page 29 - V. Gas Piping

35E. Alliance SL™ Water Heater (if used). May be used with Intermittent Circulation only. Refer to Alliance SL™ Installation, Operating and Servic

Page 30

361. Standing Pilot (24) Sequence of Operationa. Normal Operationi. Thermostat or operating control calls for heat. Vent Damper (if used) opens.ii

Page 31 - VI. Venting

37Figure 29: Wiring Diagram, Standing Pilot (24V), USA and Canada, Continuous Circulation

Page 32

38Figure 30: Wiring Diagram, Standing Pilot (24V), USA and Canada, Intermittent Circulation

Page 33

392. Electronically Supervised Standing Pilot (OP) Sequence of Operationa. Normal Operationi. Thermostat or operating control calls for heat.ii. T

Page 34 - VII. Electrical

4Table of Contents I. Pre-Installation ...6 II. Boiler Assembly ...

Page 35

40Figure 31: Wiring Diagram, OP/OP-CSD-1 Ignition System, Continuous Circulation

Page 36

41Figure 32: Wiring Diagram, OP/OP-CSD-1 Ignition System, Intermittent Circulation

Page 37

424. Honeywell EI Sequence of Operationa. Normal Operationi. Thermostat or operating control calls for heat. Vent Damper (if used) opens.ii. Igni

Page 38

43Figure 33: Wiring Diagram, Honeywell EI, USA, Continuous Circulation

Page 39

44Figure 34: Wiring Diagram, Honeywell EI, USA, Intermittent Circulation

Page 40

45Figure 35: Wiring Diagram, Honeywell EI, Canada, Continuous Circulation

Page 41

46Figure 36: Wiring Diagram, Honeywell EI, Canada, Intermittent Circulation

Page 42

476. Electronically Supervised Intermittent Ignition (EP/EP-CSD-1) Sequence of Operationa. Normal Operationi. Thermostat or operating control ca

Page 43

48Figure 37: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Continuous Circulation

Page 44

49Figure 38: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Intermittent Circulation

Page 45

5Figure 1: Dimensional DataBoiler ModelDimensions (Inches)Recommended Chimney Size (Round) Water Content (Gallons)Approx. Shipping Weight (LB.)A B CD

Page 46

50Figure 39: McDonnell & Miller 750P-MT (120V) L.W.C.O. Wiring for Boilers with 24V Limit CircuitsFigure 40: McDonnell & Miller 750P-MT (120

Page 47

51Figure 41: Hydrolevel OEM - 170/550/650/750 (120V) L.W.C.O. Wiring for Boilers with 24V Limit CircuitsFigure 42: Hydrolevel OEM - 170/550/650/750

Page 48

52WARNINGCompletely read, understand and follow all instructions in this manual before attempting start-up.A. Safe operation and other perf

Page 49

53Figure 43: Lighting Instructions (24V Standing Pilot)

Page 50

54Figure 44: Operating Instructions (EI)

Page 51

55Figure 45: Lighting Instructions (OP)

Page 52 - VIII. System Start-Up

56Figure 46: Operating Instructions (EP)

Page 53

57BOILER OPERATING INSTRUCTIONS TO SHUT DOWN: 1. Close manual main shut-off valve(s) and pilot valve(s). 2. Turn off main electric

Page 54

58I. Check pilot burner ame and main burner ames through observation port.1. Check pilot ame. Refer to Table 11 for appropriate pilot detail.2.

Page 55

59CAUTIONAvoid operating this boiler in an environment where saw dust, loose insulation bers, dry wall dust, etc. are present. If boiler is op

Page 56

6I. Pre-InstallationWARNINGCarefully read all instructions before installing boiler. Failure to follow all instructions in proper order can cau

Page 57

60b. Increase input rate if less than 98% of rating plate input. Increase manifold gas pressure no more than 0.3 inch w.c. If measured input rate is

Page 58

61IX. ServiceWARNINGService on this boiler should be undertaken only by trained and skilled personnel from a qualied service agency. Inspections sho

Page 59 - L. Check Limit(s)

62Important Product Safety InformationRefractory Ceramic Fiber ProductWarning:The Repair Parts list designates parts that contain refractory ceramic f

Page 60

63F. Clean Combustion Chamber by vacuuming. Exercise care to avoid damaging Base Insulation. G. Install Burners by reversing procedures used to rem

Page 61 - IX. Service

64Yellow LED Flash CodeaIndicates Recommended Service ActionHeartbeat Normal Flame Signal N/A2 Weak Flame Signal - System will ope

Page 62

65Green LED Flash Code(X + Y)aIndicates Next System Action Recommended Service ActionOFF No “Call for Heat” N/A NoneFlash FastStartup - Flame sense ca

Page 63

66Honeywell EI Trouble Shooting Guide

Page 64 - Flash Code

67All Series 8H Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance in locating a Burnham Di

Page 65

68Item No. Description Part No.Quantity805H 806H 807H 808H 809H 810H1. Heat Exchanger Assembly1 Complete (Less Flue Bafes)6171605 1 --- --- --- ---

Page 66

69Item No. Description Part No.Quantity805H 806H 807H 808H 809H 810H2. Canopy2A Canopy6111605 1 --- --- --- --- ---6111606 --- 1 --- --- --- ---61116

Page 67 - X. Repair Parts

7b. If result is less than 50 ft3 per 1,000 Btuh, space is considered a conned space.4. Determine building type. A building of unusually tight cons

Page 68 - 1. Heat Exchanger Assembly

70Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H3. Base Assembly3A Base End Panel 7181601 2 2 2 2 2 23B Base Channel Assembly61816

Page 69 - 2. Canopy

71Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H4. Manifold and Main Burners4A Main Burner 8231602 8 10 12 15 17 194BMain Burner w

Page 70

72Item No.Description Part No. Size Quantity5-1 Gas Train -- Standing Pilot (24V, OP) 24V: USA & Canada, 6 & 7

Page 71

73Item No.Description Part No. Quantity5-2 Gas Train -- Standing Pilot (OP-CSD-1) OP-CSD-1: USA Only, 8-10 Section, LP G

Page 72

74Item No.Description Part No. Size Quantity5-3 Gas Train -- Intermittent Ignition (EI) USA: 5 - 10 Section, Natural and

Page 73 - Description Part No. Quantity

75Item No.Description Part No. Size Quantity5-4 Gas Train -- Intermittent Ignition (EP) USA & Canada: 6 - 10 Section,

Page 74

76Item No.Description Part No. Quantity5-5 Gas Train -- Intermittent Ignition (EP-CSD-1) USA Only: 8 - 10 Section, Natur

Page 75

77Item No.Description Part No. Size Quantity5-6 Pilot Assembly and Piping -- Standing Pilot (24V)

Page 76

78Item No.Description Part No. Size Quantity5-7 Pilot Assembly and Piping -- Intermittent Ignition (Honeywell EI) USA

Page 77

79Item No.Description Part No. Size Quantity5-8 Pilot Assembly and Piping -- Intermittent Ignition (Honeywell EI) Canada

Page 78

8 II. Boiler AssemblyA. Remove Crate 1. Remove all fasteners at crate skid.2. Lift outside container and remove with all other inside protective sp

Page 79

80Item No.Description Part No. Size Quantity5-9 Pilot Assembly and Piping -- Standing Pilot (OP)

Page 80

81Item No.Description Part No. Size Quantity5-10 Pilot Assembly and Piping -- Standing Pilot (OP-CSD-1)

Page 81

82Item No.Description Part No. Size Quantity5-11 Pilot Assembly and Piping -- Intermittent Ignition (EP)

Page 82

83Item No.Description Part No. Size Quantity5-12 Pilot Assembly and Piping -- Intermittent Ignition (EP-CSD-1)

Page 84

85Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H6. Jacket6 Complete60416111 1 --- --- --- --- ---60416121 --- 1 --- --- --- ---604

Page 85

86Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H6. Jacket (Continued)6G Jacket Front Removable Panel7041605 1 --- --- --- --- ---

Page 86

87Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H7. Trim and Miscellaneous ControlsALimit, 140-220°F, HoneywellL4080D1218 (EI &

Page 87

88Item No.Description Part No.Quantity805H 806H 807H 808H 809H 810H8. Draft Hood and Automatic Vent Damper8A Draft Hood8111605 1 --- --- --- --- ---8

Page 88

89SERVICE RECORDDATE SERVICE PERFORMED

Page 89 - SERVICE RECORD

96. Lift boiler with pry bar. Remove wood blocks. Lower boiler.C. For Packaged Boiler only, proceed to Paragraph E.D. Test Section Assembly for le

Page 90

90SERVICE RECORDDATE SERVICE PERFORMED

Page 91

91SERVICE RECORDDATE SERVICE PERFORMED

Commentaires sur ces manuels

Pas de commentaire