Burnham 20_PV_I Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Chaudière à eau Burnham 20_PV_I. Burnham 20_PV_I User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 32
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
1
Price - $3.00
INSTALLATION, OPERATING
AND
SERVICE INSTRUCTIONS
SERIES 2PV
GAS BOILER
8141775R9-11/99
For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide
Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number
20_PV_I-_ _ _ _
Boiler Serial Number
6_ _ _ _ _ _ _
Installation Date
Heating Contractor Phone Number
Address
Vue de la page 0
1 2 3 4 5 6 ... 31 32

Résumé du contenu

Page 1 - GAS BOILER

1Price - $3.00INSTALLATION, OPERATINGANDSERVICE INSTRUCTIONSSERIES 2PVGAS BOILER8141775R9-11/99For service or repairs to boiler, call your heating con

Page 2 - Table of Contents

10Table 5: Burnham Vent System ComponentsFigure 7: Vent Connector InstallationB. Removal of Existing Boiler. For installations notinvolving the replac

Page 3 - Figure 1: Elevation Views

11D. Install Vent Pipe, General.1. Start at vent connector. Work toward vent terminal.2. Use ¾ inch pipe strap to support horizontal runs,maintain ven

Page 4 - I. Pre-Installation

12Figure 9: Recommendations for Thimble and Wall PenetrationVI. ElectricalA. General. Install wiring and ground boiler inaccordance with requirements

Page 5 - II. Unpack Boiler

13Figure 10: Wiring DiagramFigure 11: Main Burner InstallationVII. System Start-upA. Safe operation and other performance criteria weremet with gas ma

Page 6 - III. Water Piping and Trim

14Figure 12: Gas Valve Pressure TapD. Prepare to check operation.1. Obtain gas heating value (in Btu per cubic foot)from gas supplier.2. Connect manom

Page 7

15Figure 16: Main Burner FlameJ. Check thermostat operation. Raise and lowertemperature setting to start and stop boiler operation.K. Check ignition c

Page 8 - IV. Gas Piping

16Figure 17: Operating Instructionspressure. Adjust gas valve pressure regulator asnecessary (turn adjustment screw counterclockwiseto decrease manifo

Page 12 - VI. Electrical

2The following terms are used throughout this manual to bring attention to the presence of hazards of various risklevels, or to important information

Page 13 - VII. System Start-up

20VIII. ServiceA. General. Inspection and service should be conductedannually. Turn off electrical power and gas supplywhile conducting service or mai

Page 14

21Table 7: Pilot Burner LocationBoilerModelMain Burner with60 Pilot Bracket *Pilot Burner LocatedBetween Main Burners*203PV 1 1 & 2204PV 2 2 &

Page 15

22Table 8: Minimum Suction PressureBoiler Model Minimum Suction Pressure203PV -0.50 inches w.c.204PV -0.50 inches w.c.205PV -0.80 inches w.c.206PV -0.

Page 16

23IX. Repair PartsAll Series 2PV Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistancein locat

Page 17

241. Section Assembly ... 252. Canopy/Blower Assembly ... 253. Base Assembly Group ...

Page 18

25KeyNo.Description[Quantity] Part Number203PV 204PV 205PV 206PV1. Section Assembly617170321 617170421 617170521 6171706212. Canopy/Blower Assembly2A

Page 19

26KeyNo.Description[Quantity] Part Number203PV 204PV 205PV 206PV3. Base Assembly Group3 Base Assembly, Complete [1] 618600391 [1] 618600491 [1] 618600

Page 20 - VIII. Service

27Key No. Description[Quantity] Part Number203PV 204PV 205PV 206PV4. Manifold and Main Burners4A Main Burner [2] 8236099 [4] 8236099 [6] 8236099 [8] 8

Page 21

28KeyNo.Description[Quantity] Part Number203PV 204PV 205PV 206PV5. Pilot Burner and Gas Valve5APilot Assembly, Natural Gas, Honeywell Q348A1333 [1] 82

Page 22 - 206PV -0.80 inches w.c

29KeyNo.Description[Quantity] Part Number203PV 204PV 205PV 206PV6. Jacket6A Jacket Wrap-A-Round Panel (1) [1] 604170312 [1] 604170412 [1] 604170512 [1

Page 23 - IX. Repair Parts

3Figure 1: Elevation ViewsNOTICEUSA boilers built for installation at altitudes greater than 2,000 feet above sea level have beenspecially orificed to

Page 25 - 203PV 204PV 205PV 206PV

31Key No. Description[Quantity] Part Number203PV 204PV 205PV 206PV7. Miscellaneous Trim and Controls7ASafety Relief Valve, 30 psi, NPT,Conbraco 10-4

Page 27 - Key No. Description

4I. Pre-InstallationC. Appliance is design certified for installation oncombustible flooring. The boiler must not be installedon carpeting.D. Provide

Page 28

52. Determine Total Input of all appliances in space.Round result to nearest 1,000 Btu per hour (Btuh).3. Determine type of space. Divide Volume by To

Page 29

6III. Water Piping and TrimCAUTIONFailure to properly pipe boiler may result inimproper operation and damage to boiler orbuilding.A. Design and instal

Page 30

7Figure 5: Recommended Bypass PipingFigure 3: Recommended Boiler Piping For Series - Loop Hot Water Heating SystemsFigure 4: Recommended Piping for

Page 31 - 8. Vent Accessory Carton

8IV. Gas PipingA. Size gas piping. Design system to provide adequategas supply to boiler. Consider these factors:1. Allowable pressure drop from point

Page 32

9Table 2: Maximum Capacity of Schedule 40 Pipe in CFH For Gas Pressures of 0.5 psig or LessTable 3: Fitting Equivalent Lengths Table 4: Specific Gravi

Commentaires sur ces manuels

Pas de commentaire